UKAS accredited slip resistance testing for distribution centres, fulfilment hubs and logistics operations. Floor testing for RIDDOR investigations, employer's liability defence and pre-commissioning acceptance.
Distribution centre operators run some of the UK's highest-workforce-density facilities. Pedestrian slip accidents at scale — a few thousand employees, 24/7 operation — translate to a consistent incident frequency that insurers and HSE both track carefully. UKAS accredited floor baseline is the reference point for compliance.
BS EN 16165 Annex C pendulum testing. UKSRG Guidelines Issue 6 operational protocol. Where contamination includes hydraulic fluid or oils, supplementary representative-contaminant testing is often more operationally informative than water-only.
Yes. Pre-commissioning acceptance testing against the floor specification is essential. If the contractor's floor fails, it's their cost to fix.
We prioritise post-incident work. Most UK DC locations accessible within 2-3 working days; urgent cases sooner.
Hygienic zones use different flooring specs (typically polyurethane resin) and should be tested with representative wet-process contamination.
Yes — we often combine slip testing with line-of-sight/visibility surveys and other pedestrian safety audits in one visit.
Fixed-fee quote within one working day. Nationwide UK coverage from our accredited laboratory in West London.