UKAS Testing Laboratory 7933 · ISO/IEC 17025 Need a quote? Call 020 8246 5562
Venue · Distribution Centres

UKAS slip testing for
distribution centres.

UKAS accredited slip resistance testing for distribution centres, fulfilment hubs and logistics operations. Floor testing for RIDDOR investigations, employer's liability defence and pre-commissioning acceptance.

Why distribution centres commission UKAS accredited slip testing

Distribution centre operators run some of the UK's highest-workforce-density facilities. Pedestrian slip accidents at scale — a few thousand employees, 24/7 operation — translate to a consistent incident frequency that insurers and HSE both track carefully. UKAS accredited floor baseline is the reference point for compliance.

Specific issues we see in distribution centres

Which standards apply

BS EN 16165 Annex C pendulum testing. UKSRG Guidelines Issue 6 operational protocol. Where contamination includes hydraulic fluid or oils, supplementary representative-contaminant testing is often more operationally informative than water-only.

What you get

Common questions

We're commissioning a new DC — should we test pre-go-live?

Yes. Pre-commissioning acceptance testing against the floor specification is essential. If the contractor's floor fails, it's their cost to fix.

Post-RIDDOR — how fast can you attend?

We prioritise post-incident work. Most UK DC locations accessible within 2-3 working days; urgent cases sooner.

What about hygienic areas inside a food DC?

Hygienic zones use different flooring specs (typically polyurethane resin) and should be tested with representative wet-process contamination.

Can you combine with other testing?

Yes — we often combine slip testing with line-of-sight/visibility surveys and other pedestrian safety audits in one visit.

Get a UKAS accredited slip test today.

Fixed-fee quote within one working day. Nationwide UK coverage from our accredited laboratory in West London.